Eco Electrix

We managed to finish our installation last week at a local Chard Factory.

Posted 25 February | by
Chard Factory Installation Image

We managed to finish our installation last week at a local Chard Factory. The extraction unit needed to be outside so we were required to extend the cabling and exhaust pipe work. As the extraction unit isn’t waterproof we installed a waterproof housing to shelter the unit. Everything was installed with minimum down time to the machine resulting in a happy customer